Concrete heats up as it sets. Engineers worked out that if Hoover Dam were poured as one solid block, it would take more than 100 years to cool and would crack. So they poured it in blocks and ran cold water through pipes buried inside.
- Built from 1931 to 1936 on the Colorado River, on the Nevada-Arizona border
- Stands 726 feet tall
- Contains 3.25 million cubic yards of concrete
- Engineers estimated a single pour would take about 125 years to cool
In the 1930s, at the bottom of a deep desert canyon on the Colorado River, thousands of workers built one of the largest structures the world had ever seen. Hoover Dam rose more than 700 feet from the canyon floor, a curved wall of concrete holding back an enormous lake. Building it required solving problems no one had faced before, including one that sounds strange: how to keep the concrete from taking a century to cool.
The dam was built to tame the Colorado River, which flooded farms in the desert Southwest in spring and dwindled to a trickle at other times. A dam could control floods, store water for irrigation and cities and generate hydroelectric power. Congress authorized the project in 1928, and construction began in 1931, in the depths of the Great Depression.
The site was Black Canyon, on the border between Nevada and Arizona, about 30 miles southeast of Las Vegas. A group of construction firms called Six Companies won the contract. Before the dam could be built, the river had to be moved out of the way. Workers blasted four huge tunnels, each 56 feet across, through the canyon walls to divert the Colorado around the construction site. Then they built temporary dams to keep the work area dry.
Workers called high scalers dangled from ropes on the canyon walls, using jackhammers and dynamite to clear loose rock. It was dangerous work, and they became famous for their daring. Crews dug down through riverbed sand and gravel to reach solid rock.
Then came the concrete. Altogether, 3.25 million cubic yards of concrete went into the dam, enough, it was often said, to pave a two-lane highway from San Francisco to New York. But there was a problem. Concrete gives off heat as it hardens through a chemical reaction. In a structure as massive as Hoover Dam, that heat would be trapped inside. Engineers calculated that if the dam were poured as a single solid block, it would take about 125 years to cool, and the uneven cooling and shrinking would cause it to crack, weakening the dam.
The solution was ingenious. Instead of one continuous pour, the dam was built as a series of separate, interlocking concrete blocks, like a giant set of building blocks, each poured in layers only a few feet high. Running through the blocks were more than 582 miles of thin steel pipes. First river water, then ice-cold water from a refrigeration plant built at the site, was pumped through the pipes, drawing heat out of the concrete. Once each section had cooled, the pipes were filled with grout, and the gaps between blocks were filled too, making the dam a single solid structure.
The work was grueling. The summer of 1931 was brutally hot, with daytime temperatures averaging around 120 degrees Fahrenheit in the canyon. Many workers lived in crude camps before a planned town, Boulder City, was built to house them. At its peak, more than 5,000 people worked on the dam. Workers went on strike over pay and conditions.
The official death toll for the project was 112 deaths connected with construction, 96 of them at the construction site, from falls, explosions, falling rock, heat and accidents. Dozens of other deaths were officially attributed to pneumonia, though some workers believed carbon monoxide from vehicles in the diversion tunnels was to blame. A popular legend claims that workers are buried inside the concrete, but that is a myth; the concrete was poured in shallow layers, and no bodies were left in the dam.
The dam was finished in 1936, more than two years ahead of schedule. President Franklin D. Roosevelt dedicated it in 1935. It is a concrete arch-gravity dam, 726 feet high and 1,244 feet long. It is 660 feet thick at the base, narrowing to 45 feet at the top, where a road runs across it.
Its name was the subject of a political fight. It was originally named after Herbert Hoover, the president who had helped make the project possible as commerce secretary. After Hoover lost the 1932 election to Roosevelt, the new administration renamed it Boulder Dam. In 1947, Congress restored the name Hoover Dam.
The dam created Lake Mead, one of the largest reservoirs in the United States. Water from the Colorado River system supplies millions of people in Nevada, Arizona and California and irrigates vast areas of farmland. The dam's generators provide electricity to the region, though output has fallen during long droughts as water levels in Lake Mead have dropped sharply.
Hoover Dam is also a work of art. Its Art Deco design includes elegant towers, terrazzo floors decorated with Native American-inspired patterns, and two giant bronze sculptures called the Winged Figures of the Republic. In the plaza, a star map in the floor records the positions of the stars on the night of the dam's dedication, so future generations could calculate exactly when it was built. Today, Hoover Dam is a National Historic Landmark and attracts millions of visitors a year.
Sources
Written in my own words, based on the Wikipedia article “Hoover Dam”, which has the full details and references. Photo via Wikipedia / Wikimedia Commons.
Know more about this?
Send me a correction or a wild related fact, and I might add it here.
One great old tip, every week
No spam. Unsubscribe anytime.